I'm sadly still in the planning phase. The airport owner has been having issues setting up all the approvals he needs from the city/state. I haven't gotten much further with the planning as its...
Type: Posts; User: tankerclown
I'm sadly still in the planning phase. The airport owner has been having issues setting up all the approvals he needs from the city/state. I haven't gotten much further with the planning as its...
They're saying that concrete is 170/yard... I found it for less than half that locally...
We'll, it looks like I may end up just being my own GC for this project. I checked with wicks and morton, they came in at 146k and 125k respectivley. If I do the contracting myself, i can build it...
I was just quoted 9500 for a 42x16 bi fold and 9900 for a 44x16. 15k for a hydraulic higher power door, installed. Are these legitimate prices?
Thanks for the input. So to correct my previous post, I'm building a storage building! It might have an airplane stored in it from time to time. Thanks for the morton info. I just talked to a...
Just wanted to revive this thread. I'm looking to build a 60x60 hangar in private land in Michigan. I was looking at morton buildings or steel. Just wondering what we are looking at for prices for...