Results 1 to 10 of 1084

Thread: Building a Nieuport 11...

Threaded View

Previous Post Previous Post   Next Post Next Post
  1. #11

    Join Date
    Aug 2011
    Location
    Alabama
    Posts
    2,236
    Work area had become a disaster with the cabane build, as it wasn't on gear and the tail was lifted up on a saw horse:



    Much better!



    Baslee style work table done! 2x4 on the saw horses, 2x6's screwed together lengthwise, stood up on edge and toed into the saw horses. MDF laid on top of them and screwed down.



    This is what it looks like under the MDF...



    Bag o' wing hardware with my name on it.



    Here's the lower wing drawn out on the MDF.

    Last edited by Frank Giger; 07-16-2020 at 04:37 PM.
    The opinions and statements of this poster are largely based on facts and portray a possible version of the actual events.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •