4/30, Work this week. I was getting antsy just finishing up all the partial cluster and wire loop welds so I did a little fabricating as well. Here you see the lower wing attachment gusset boxes. Later after the wing gets made and the attaching brackets are positioned these boxes get marked, drilled, and a sleave welded in so the bolt can pass through for the wing. I also welded in the 3 13mm cowling and turtle deck hoops.
I started messing with the bungee box assemblies that weld on to the sides of the axle boxes but this was at the end of a 14 hour day. You know you have had enough when you cant see your weld puddle anymore. Time to stop before you break something, blow a big hole, or get frustrated.
While waiting for a fellow builder to show up so we could bend him some wire loops for his DR I build I made a simple fixture to prop the tail post level so I could start jigging up the engine bearer tubes. As you can see we are all level.
I hope everyone building got some time in this weekend.
Gentle breezes and fair skys
Jim