Results 1 to 3 of 3

Thread: EAB IFR Certification

  1. #1

    Join Date
    Dec 2014
    Posts
    12

    EAB IFR Certification

    If I start building and make an EAB aircraft, but to initially save money it is a VFR Day/Night aircraft can it later be modified to include IFR. Would like to postpone the addition of some items that might preclude the IFR?

    What is the process for changing it later, does the DAR need to see it again?

    Thanks,
    Gerry

  2. #2

    Join Date
    Oct 2014
    Location
    Tehachapi, CA
    Posts
    219
    Quote Originally Posted by Gerry View Post
    If I start building and make an EAB aircraft, but to initially save money it is a VFR Day/Night aircraft can it later be modified to include IFR.
    Yes.

    Quote Originally Posted by Gerry View Post
    What is the process for changing it later, does the DAR need to see it again?
    When you get your operating limitations, they'll say something along the lines of "restricted to Day VFR unless properly equipped per 91.205 for night or IFR operation".

    So you don't need to do anything other than make sure that the aircraft is equipped for whatever service you're going to use it for per 91.205 - no inspection necessary.

    _IF_ something you do would be considered a "Major Change" per 21.93, you'd then need to comply with whatever your Operating Limitations said you'd have to do for a Major Change. Generally, a written notice to the local FSDO/MIDO and a response from them, plus 5+ hours back in Phase I.

  3. #3

    Join Date
    Dec 2014
    Posts
    12
    Quote Originally Posted by Marc Zeitlin View Post
    Yes.

    When you get your operating limitations, they'll say something along the lines of "restricted to Day VFR unless properly equipped per 91.205 for night or IFR operation".

    So you don't need to do anything other than make sure that the aircraft is equipped for whatever service you're going to use it for per 91.205 - no inspection necessary.

    _IF_ something you do would be considered a "Major Change" per 21.93, you'd then need to comply with whatever your Operating Limitations said you'd have to do for a Major Change. Generally, a written notice to the local FSDO/MIDO and a response from them, plus 5+ hours back in Phase I.
    Thank you Marc

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •