Page 2 of 2 FirstFirst 12
Results 11 to 13 of 13

Thread: Buttercup Project - Steve Wittman -First Flown in 1938

  1. #11

    More AN hardware

    I got another batch of AN hardware...
    $80 bucks doesn't buy much.
    .
    I'm getting the controls assembled.
    I used clevis pins on the rudder linkage.
    .
    Gotta Fly...
    Attached Images Attached Images   

  2. #12

    Floor pans

    I've got a couple of the floor pans in place,
    I need to put the Brake cyls on before the next pan.
    making sure the heads of the screws get silicone under them for added holding strength.
    .
    Gotta Fly...
    Attached Images Attached Images  

  3. #13

    Floor pans in place

    Brake cyls in position... Still need to hook up the lines.
    I can do that with the other floor pan in place.
    It can be reached below too.
    .
    Gotta Fly...
    Attached Images Attached Images   

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •