Panel shot...
interior pieces just in place temporarily.
Panel shot...
interior pieces just in place temporarily.
Last edited by jimdc8; 01-14-2014 at 05:05 PM.
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.
Panel with Dynon templates taped in place...
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.
Here is a pic of the left motor mount. Due to the shallow geometry of the firewall hardpoints, a truss style mount is required. Weighing in just under 10 pounds, I over-engineered the mount but am confident in the strength. It passed a 6 g load test.
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.
Recent photos with engine mounts installed. Powdercoated pearl color.
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.
Just fabricated and installed landing light enclosure. Also streamlines upper portion of nosegear leg. Landing light is Aveo LED...very bright and low amps! Airframe just about complete...just waiting for engines and avionics. I am just starting to build the engines now and hope to have them installed late summer or early fall. Also taking advantage of the warmer weather to finish the filling and sanding of all the fiberglass work.
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.
Holy crap.
The opinions and statements of this poster are largely based on facts and portray a possible version of the actual events.
Made my night, Frank! Too funny...that movie is most excellent
Filling & sanding....about 80% complete.
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.
Painted cases bolted to mounts for sizing purposes. Building shortblocks very soon...
Last edited by jimdc8; 06-27-2014 at 08:19 AM.
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.
Both engines have cases closed with ARP case studs with cam & crankshafts installed. Should have both shortblocks complete within next 2 weeks. Fifth bearings installed on both cases last week. Virtually everything other than the cases and head castings will be brand new parts.
Measure it with a micrometer, mark it with a grease pencil & cut it with an axe.