OK. I now have all the Cessna landing gear parts I need for my project, not including the wear parts (tires & tubes (I have used ones for now), brake pads, & gear leg bushing)

Guess how much I paid for all this, accumulated over approx 7 months time.

From a (few different) 172N's
gear box assembly (I need the fittings the legs mount in)
gear legs with axles
another set of axles with wheel nuts
wheels
brakes

and nose gear with mounting fittings from a 182K

Name:  100_0372.jpg
Views: 400
Size:  94.0 KB