Search:

Type: Posts; User: wmax351

Search: Search took 0.00 seconds.

  1. Replies
    15
    Views
    9,446

    Sport pilot phase 1 for LSA compliant E-AB

    Hi, I am starting up a small flying club with a Best-off Skyranger. It still needs the rest of it's phase 1 completed, so we are going to be doing that. However, one DAR we talked to who is helping...
  2. Wonder if anyone has done that before. I'm...

    Wonder if anyone has done that before.

    I'm planning to get the whole thing modeled in solidworks. But the fuselage should be easier to fit, as it's only slightly longer, and one end is narrow.
  3. Good point! I'll include that on my more polished...

    Good point! I'll include that on my more polished model.
  4. Thanks! I'll play with it too later on, with a...

    Thanks! I'll play with it too later on, with a better wing model. That one was just thrown together with some dwg's for the ribs with offsets for the rib caps. I'll go measure some of the critical...
  5. I updated the file with an e-drawings file as...

    I updated the file with an e-drawings file as well. Might be a touch more compatible.
  6. Using solidworks to verify wing egress from basement

    I've got a basement i'm planning to turn into a workshop for a fly baby. I do want to confirm that I will be able to remove the plane without needing to build egress windows through the foundation. ...
Results 1 to 6 of 6